London Office

Griffin Mining Limited
6th Floor
60 St James's Street
London
SW1A 1LE

Tel: +44 (0)20 7629 7772
Fax: +44 (0)20 7629 7773

News News 2012 New JORC Resource for Caijiaying Mine - 32% Increase to Mineral Resource from 38.6 to 51.2 million tonnes

New JORC Resource for Caijiaying Mine - 32% Increase to Mineral Resource from 38.6 to 51.2 million tonnes

Griffin” or “the Company”) is delighted to announce that a new JORC reported Mineral Resource Estimate for Caijiaying has been finalized and not only increases the contained tonnes within the Zone III mineral resource after mining depletion, but also almost doubles the contained tonnes and metal within the Zone II mineral resource. In summary:

  • 1. A 32% increase in the mineral resource at Zones II and III rising from 38.6 million tonnes to 51.2 million tonnes, representing a 50 plus year mine life at the increased throughput rate. This represents an increase of 17% more zinc in the deposit.
  • 2. An 8% increase in the mineral resource at Zone III from 29.1 million tonnes to 31.5 million tonnes.
  • 3. A 107% increase in the mineral resource at Zone II from 9.4 million tonnes to 19.6 million tonnes.

Drilling has continued to provide success along strike and south of Zone III to Zone II, allowing the reinterpretation and upgrade of the Zone II mineral resource. Diamond drilling continued underground in Zone II with a total of 33,887 metres drilled. Surface diamond drilling continued in Zone II with a total of 10,053 metres drilled. This drilling continued to add significant mineralization to the Zone II mineral resource.

With the Mineral Resource Estimate at Zone II approaching 20 million tonnes and the drilling density achieving the required level, an application for a further mining licence will be made during 2012. The mining licence will ensure that all the known mineralisation covering Zones II and III and the contiguous area between them will be covered. This should allow a second ore source to be mined at Caijiaying and significantly extend the life of the mining operations.

The 2012 Mineral Resource estimate is reported at a zinc cut-off of 1%. Tabled below is the summary of the recently updated 2012 Mineral Resource.

Lodes

Category

Tonnes

Metal Grade

Contained Metal

Zinc

Lead

Silver

Gold

Zinc

Lead

Silver

Gold

'000 t

%

%

Grammes
per
tonne

Grammes
per
tonne

Tonnes

Tonnes

Ounces

Ounces

Zone III -
Fu, Jin, Qing, Xiao, Ju, Chang, Hong Long lodes

Measured

4,447

5.6

0.32

30.3

0.76

249,000

14,000

4,331,900

109,400

Indicated

10,926

4.84

0.26

27.03

0.73

529,000

28,000

9,495,000

258,000

Inferred

1,146

4.78

0.28

31.37

0.46

55,000

3,000

1,156,200

17,000

Sub total

16,519

5.04

0.28

28.21

0.72

832,000

46,000

14,983,100

384,000

Zone III -
Caijiaying Inferred

Inferred

15,075

3.91

0.22

21.68

0.76

589,000

32,000

10,507,600

370,400

Sub-total Zone III

31,594

4.50

0.25

25.09

0.74

1,422,000

78,000

25,490,700

754,800

 

 

 

 

 

 

 

 

 

 

 

Zone II -
ALL

Measured

-

-

-

-

-

-

-

-

-

Indicated

4,056

3.02

0.68

24.87

0.30

123,000

27,000

3,242,800

39,300

Inferred

15,570

3.31

0.75

24.53

0.25

516,000

117,000

12,276,700

124,200

Sub-total Zone II

19,626

3.25

0.73

24.6

0.26

638,000

144,000

15,519,600

163,500

 

 

 

 

 

 

 

 

 

 

Total

51,220

4.02

0.43

24.90

0.56

2,060,000

222,000

41,010,200

918,300

The information in this report that relates to the May 2012 Mineral Resource estimates is based on information compiled by Mr Matthew Stevens, B.Sc. (Hons) Geology, Member AIG. Mr Stevens was a full time employee of CSA Global Pty Ltd. Mr Stevens has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr Stevens consents to the inclusion in the report of the matters based on his information in the form and context which they appear.

Chairman’s Statement

Chairman Mladen Ninkov commented, “The new JORC resource is a further indication and vindication of the size and scale of the orebody at Caijiaying. New drilling continues on a consistent basis to add further resources and additional mine life to the operations at Caijiaying. The Company continues to move forward with plans for even higher extraction and processing rates of this world class orebody. Again, I could not be happier for the Company’s shareholders.”